Mercury NZ Limited
On 7 July 2021, during commissioning activities at Rotokawa Power Station, fluids with significantly different temperatures unintentionally mixed, resulting in a severe steam hammer event that damaged valves and pipework, leading to the loss of steam containment. No injuries were sustained.
Geothermal